HUASO HYBRID (CAISO-1954) — Project Summary

Queue ID
CAISO-1954
Capacity
203.93 MW
Technology
Solar+Battery
Status
active
Location
Fresno, CA
Region
CAISO
Developer
—
IA Status
IA Executed

HUASO HYBRID

CAISO-1954BetaActiveSolarBatteryCAISOLBNL + Live

203.93 MW hybrid in Fresno, CA · In queue since April 2021 · Proposed COD December 2026

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

203.93 MW

Capacity

2

Components

Solar + Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Mar 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 11m

IA → COD

1y 9m

Total Duration

3y 11m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementMar 25, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2026-12-03

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 2026
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — IA Executed (March 2025), Facility Study phase per CAISO queue
Financing
Not recorded

Milestones in this assessment

IA executedMar 25, 2025

Interconnection Agreement executed with CAISO

caiso.com
COD targetDec 2026Latest in this assessment

Proposed commercial operation date December 2026

cleanview.co
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/planned-solar-projects/CA/1954_photovoltaic/huaso-hybrid
  2. caiso.com/documents/publicqueuereport.xlsx
  3. interconnection.fyi/project/caiso-1954
  4. cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2024-2026-irp-cycle-events-and-materials/assumptions-for-the-2025-2026-tpp/mappingcifrom_caisoqueue11-25-2024.xlsx

Commercial operation date: LBNL queue snapshot shows proposed COD of 2026-12-03. Cleanview aggregator confirms 'expected online December 2026'. No contradictory signals found in search results.

Developer: LBNL snapshot has null developer field. No press releases, corporate announcements, or ownership information found in any search results. All results are queue aggregators or regulatory filings with no developer attribution.

Status: LBNL shows 'active' status with IA executed 2025-03-25. Multiple CAISO queue snapshots (Nov 2024, Dec 2022) confirm ACTIVE status in Cluster 14, Facility Study phase. No withdrawal or suspension signals.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The HUASO HYBRID project is a proposed 203.93 MW hybrid solar and battery energy storage project located in Fresno County, California. The development project, consisting of 102.1 MW of solar generation and 101.83 MW of battery storage, is interconnected to the PG&E utility network.

The project is listed in the CAISO interconnection queue under queue ID CAISO-1954, with an entry date of April 15, 2021. The proposed commercial operation date is December 3, 2026. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Gates 230 kV substation.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Fresno

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Gates 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar102.1 MW · 50%
Battery101.83 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
FIFTHS_7_N003
POI Substation
Gates Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.