AUSTRALIS (CAISO-1952) — Project Summary

Queue ID
CAISO-1952
Capacity
614 MW
Technology
Solar+Battery
Status
active
Location
Merced, CA
Region
CAISO
Developer
—
IA Status
IA Executed

AUSTRALIS

CAISO-1952BetaActiveSolarBatteryCAISOLBNL + Live

614 MW hybrid in Merced, CA · In queue since April 2021 · Proposed COD April 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

614 MW

Capacity

2

Components

Solar + Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Feb 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 10m

IA → COD

6y 2m

Total Duration

3y 10m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementFeb 23, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2031-04-18

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 18, 2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in CAISO queue (Cluster 14, solar + storage, Merced County) with IA executed 2025-02-23; no public construction or financing news found.
Financing
Not recorded

Milestones in this assessment

IA executedFeb 23, 2025Latest in this assessment

LBNL lists the interconnection agreement as executed on 2025-02-23. The CAISO queue report confirms the project is active in Cluster 14.

caiso.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. caiso.com/documents/publicqueuereport.pdf
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/1952_storage/australis
  3. interconnection.fyi/project/caiso-1952
  4. gridvisionai.com/retrospectives/caiso-los-banos-230-kv

Commercial operation date: Only the LBNL proposed COD (2031-04-18) exists. Cleanview's 'expected to come online in April 2031' matches it but appears to be derived from the same queue data, so it is not an independent post-LBNL signal.

Developer: LBNL developer field is null and no search result names a developer or parent company for AUSTRALIS. The results are queue listings and unrelated Australian or oil-and-gas 'Australis' entities.

Status: LBNL shows active with an executed IA. The CAISO public queue report and the GridVision, interconnection.fyi and Cleanview listings all still show the project in queue. None reports construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The AUSTRALIS project is a proposed 614 MW hybrid solar and battery energy storage project located in Merced County, California. The development project consists of 307 MW of solar photovoltaic generation paired with 307 MW of battery energy storage. The project is interconnected within the CAISO region and is in the Pacific Gas & Electric (PGAE) service area.

The project, identified as CAISO-1952 in the CAISO interconnection queue, entered the queue on April 15, 2021, with a proposed commercial operation date of April 18, 2031. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Los Banos 230 kV substation.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Merced

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Los Banos 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar307 MW · 50%
Battery307 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SNTANLA_6_N001
POI Substation
Los Banos Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.