DARDEN
2,364.768 MW hybrid in Fresno, CA · In queue since April 2021 · Proposed COD July 2027
2,364.768 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Sep 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 5m
IA → COD
2y 10m
Total Duration
3y 5m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 18–30 months
Proposed COD: 2027-07-19
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
- —·Intersect Power→IPX Poweresgtoday.com
Milestones in this assessment
California Energy Commission approved the Darden Clean Energy Project, the first under the Opt-In Certification program.
mercomindia.comIPX Power closed $4.95B committed financing to build Darden solar and storage.
constructionreviewonline.comResearch sources and reasoning (8 recorded sources)
medium confidence at research time
- mercomindia.com/california-approves-4600-mwh-darden-battery-energy-storage-project
- esgtoday.com/intersect-spinoff-ipx-power-secures-4-95-billion-to-build-massive-california-solar-storage-project/
- mercomcapital.com/ipx-power-closes-4-95b-financing-solar-storage-projects/
- renewablesnow.com/news/ipx-power-secures-usd-4-95bn-financing-for-darden-solar-bess-giant-1297267/
- constructionreviewonline.com/darden-clean-energy-project-secures-4-95bn-to-build-californias-largest-solar-and-battery-facility/
- energiesmedia.com/intersect-power-darden-clean-energy-project/
- energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/darden-clean-energy-project
- linkedin.com/posts/mortenson_what-does-a-large-scale-investment-in-grid-activity-7468334785824866304-PSVr
Commercial operation date: None of the news or search snippets gives an explicit COD, so only the LBNL proposed COD of 2027-07-19 is available. Financing closed and Mortenson is building, which is consistent with that date, but nothing corroborates it.
Developer: The LBNL developer field is null. The CEC lists the project owner as IP Darden I, LLC, a project shell. Earlier coverage names Intersect Power, while the 4.95B financing coverage names IPX Power, described as an Intersect spinoff, as the current owner.
Status: Mortenson's LinkedIn post says 'We're building' the Darden Solar + Storage project, and the financing coverage describes funding for construction and operation. That puts the project past the queue-only Active state.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The DARDEN project is a proposed 2364.77 MW hybrid solar and battery energy storage development in Fresno County, California. The project consists of 1182.38 MW of solar photovoltaic generation and 1182.38 MW of battery energy storage. It is located within the CAISO region and is interconnected to the PGAE utility grid at the Manning-Midway 500kV Line.
The project entered the CAISO interconnection queue (CAISO-1949) on April 15, 2021, with a proposed commercial operation date of July 19, 2027. The interconnection agreement has been executed. The DARDEN project has been the subject of recent news coverage, with 9 articles covering regulatory, grid, and industry aspects of the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Manning-Midway 500kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesSolar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.