LOTUS SOLAR 2
406.4 MW hybrid in Madera, CA · In queue since April 2021 · Proposed COD January 2032
406.4 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2032
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
10y 9m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2032-01-04
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- caiso.com/documents/publicqueuereport.pdf
- interconnection.fyi/project/caiso-1934
- cleanview.co/power-projects/planned/battery-storage-projects/california/1934_storage/lotus-solar-2
Commercial operation date: Only the LBNL proposed COD (2032-01-04) is usable. The Cleanview snippet says the project is "expected to come online in November ..." but the year is truncated, so it can't confirm or contradict LBNL. No press release or news item gives a financing-backed target.
Developer: The LBNL developer field is null. None of the search results (queue aggregators, the CAISO public queue report, a CPUC document) name a developer or parent company.
Status: The CAISO public queue report and the interconnection.fyi aggregator both show the project as ACTIVE, consistent with LBNL. There is no sign of withdrawal, construction or an executed IA.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The LOTUS SOLAR 2 project is a proposed 406.4 MW hybrid solar and battery energy storage project in Madera County, California. The development project consists of 203.2 MW of solar photovoltaic generation paired with 203.2 MW of battery storage. It is located within the California Independent System Operator (CAISO) region and is interconnected to the PG&E utility grid at the Borden 230 kV point of interconnection.
The project, identified as CAISO-1934 in the CAISO interconnection queue, entered the queue on April 15, 2021. Its proposed commercial operation date is November 17, 2030. The project's interconnection status is currently in the System Impact Study phase.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Madera
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Borden 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.