ZORIN STORAGE
252 MW storage in Alameda, CA · In queue since April 2021 · Proposed COD February 2034
252 MW
Capacity
1
Components
Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Jul 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 3m
IA → COD
8y 7m
Total Duration
4y 3m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 6–18 months
Proposed COD: 2034-02-19
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with CAISO
caiso.comResearch sources and reasoning (9 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/california/1911_storage/zorin-storage
- efiling.energy.ca.gov/GetDocument.aspx?tn=258015&DocumentContentId=93946
- caiso.com/documents/publicqueuereport.xlsx
- mlq.ai/interconnection-queue/?iso=CAISO&
- docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M534/K048/534048570.PDF
- caiso.com/documents/prohibitedprojectnames.xlsx
- cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2022-irp-cycle-events-and-materials/2023-2024-tpp-portfolios-and-modeling-assumptions/caisointerconenctqueue_analysis_121522.xlsx
- cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2024-2026-irp-cycle-events-and-materials/assumptions-for-the-2025-2026-tpp/mappingcifrom_caisoqueue11-25-2024.xlsx
- interconnection.fyi/project/caiso-1911
Commercial operation date: Only source available is LBNL queue snapshot showing proposed COD of 2034-02-19. No news articles, press releases, or developer announcements found to validate or contradict this date.
Developer: LBNL snapshot shows null developer. Search results only reference the project name 'ZORIN STORAGE' without identifying any operating company, parent entity, or project LLC. No press releases or corporate announcements found.
Status: LBNL shows 'active' status with IA executed on 2025-07-31. This is corroborated by CAISO public queue report (June 2026) showing ACTIVE status. No news of construction start or withdrawal.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The ZORIN STORAGE project is a proposed 252 MW battery energy storage system located in Alameda County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-1911, with a queue entry date of April 15, 2021. Pacific Gas and Electric (PGAE) is the utility.
The proposed commercial operation date for the ZORIN STORAGE project is February 19, 2034. The project's interconnection status is currently in the System Impact Study phase. Recent news coverage has discussed the development project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Alameda
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Newark 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- NEWARKD_1_N001
- POI Substation
- Newark Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
ZORIN STORAGE
Data-driven briefing on ZORIN STORAGE — fleet, generation, financial, and news signals.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.