GOLDEN FLATS
365.12 MW storage in Stanislaus, CA · In queue since April 2021 · Proposed COD September 2031
365.12 MW
Capacity
1
Components
Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Apr 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4 years
IA → COD
6y 5m
Total Duration
4 years
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 6–18 months
Proposed COD: 2031-09-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
LBNL records an executed interconnection agreement for Golden Flats (CAISO-1903). The interconnection.fyi listing corroborates the project's Active queue status but not the IA date.
interconnection.fyiResearch sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/projects/market/CAISO
- interconnection.fyi/projects/transmission-owner/pacific-gas-and-electric-company
- pge.com/assets/pge/docs/regulation/federal-energy-regulatory-commission/ferc-form-1-2025.pdf
Commercial operation date: No news or press release gives a post-LBNL COD for Golden Flats. The only date is the LBNL proposed COD of 2031-09-01, and the search results are queue listings with no developer target.
Developer: LBNL lists no developer, and none of the search results name an operating company or parent for Golden Flats. The queue listings and the PG&E FERC Form 1 reference give no ownership information.
Status: LBNL shows an IA executed on 2025-04-30 and an active queue status. The interconnection.fyi listing confirms Active, and the PG&E FERC Form 1 lists Golden Flats as an ISO interconnection entry.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Golden Flats project is a proposed 365.12 MW battery storage project located in Stanislaus County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-1903, with a queue entry date of April 15, 2021. The proposed commercial operation date is September 1, 2031. The project's interconnection status is currently in the System Impact Study phase. Pacific Gas and Electric (PGAE) is the utility involved, and the point of interconnection is the Westly-Quinto 230 kV line.
The Golden Flats project has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Stanislaus
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Westly-Quinto 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.