ARGES BESS (CAISO-1856) — Project Summary

Queue ID
CAISO-1856
Capacity
102.15 MW
Technology
Battery
Status
active
Location
Solano, CA
Region
CAISO
Developer
—
IA Status
System Impact Study

ARGES BESS

CAISO-1856BetaActiveBatteryCAISOLBNL + Live

102.15 MW storage in Solano, CA · In queue since April 2021 · Proposed COD June 2029

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

102.15 MW

Capacity

1

Components

Battery

5y 7m

In Queue

System Impact Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 2m

Study Phase

C14

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

Active sheet; C14

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-18

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 18, 2029
From queue filing
Developer in saved assessment
Middle River Power
Filed as Arges BESS LLC
Status at research time
Active
Active — in CEC permitting review as part of Vaca Dixon Power Center; EIR expected June 2026 per local news
Financing
Not recorded

Milestones in this assessment

Permit approvedJun 15, 2026Latest in this assessment

Environmental Impact Report expected from California Energy Commission for Vaca Dixon Power Center (includes Arges BESS)

dailyrepublic.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. energy.ca.gov/powerplant/battery-storage-system/vaca-dixon-power-center-project
  2. middleriverpower.com/vacadixon/
  3. dailyrepublic.com/news/corby-assessment-eir-expected-june-15-as-bess-industry-surges-in-2026/article_b1031b7e-52c8-409b-b8aa-caa48daa837f.html
  4. efiling.energy.ca.gov/GetDocument.aspx?tn=268181&DocumentContentId=105230

Commercial operation date: Only LBNL queue data provides a specific COD of June 18, 2029. No news sources or press releases mention an updated or alternative target date. CEC filings and developer materials describe the project but do not specify commercial operation timing.

Developer: CEC filings identify 'Arges BESS LLC' as the legal applicant entity. The Middle River Power website (middleriverpower.com/vacadixon/) presents the Arges BESS as part of their Vaca Dixon Power Center portfolio, indicating Middle River Power is the operating parent company behind the project LLC.

Status: LBNL shows 'Active' status at System Impact Study phase. Recent Daily Republic article (1 week ago) confirms the project is advancing through California Energy Commission review with an EIR expected June 15, 2026, indicating active permitting progress.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The ARGES BESS project is a proposed 102.15 MW battery storage project located in Solano County, California. The project is in the CAISO interconnection queue (queue ID CAISO-1856) with an interconnection queue entry date of April 15, 2021. The proposed commercial operation date is June 18, 2029.

The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Vaca-Dixon 115 kV substation. Pacific Gas and Electric (PGAE) is the utility associated with the project. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Solano

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Vaca-Dixon 115 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.