BRUSHY
400 MW storage in Solano, CA · In queue since April 2021 · Proposed COD February 2031
Withdrawn from the CAISO queue in June 2026, according to CAISO's queue (Oct 2026).
400 MW
Capacity
1
Components
Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9y 10m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Proposed COD: 2031-02-18
Project withdrew from interconnection queue
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/california/1843_storage/brushy
- caiso.com/documents/publicqueuereport.xlsx
- cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/2022-irp-cycle-events-and-materials/2023-2024-tpp-portfolios-and-modeling-assumptions/caisointerconenctqueue_analysis_121522.xlsx
- mlq.ai/interconnection-queue/?iso=CAISO&
Commercial operation date: Only LBNL queue data provides a COD of February 2031. No news sources, press releases, or developer announcements found to validate or contradict this date.
Developer: LBNL snapshot lists developer as null. No press releases, corporate announcements, or news coverage found identifying the project sponsor or operating company.
Status: LBNL reports 'active' status in System Impact Study phase. No news coverage or developer announcements found to indicate progression beyond interconnection studies.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The BRUSHY project is a proposed 400 MW battery storage project located in Solano County, California. The project is interconnected to the CAISO grid at the Lambie 230 kV point of interconnection and is in the CAISO interconnection queue as entry CAISO-1843, with a queue entry date of April 15, 2021.
The project's interconnection status is currently in the System Impact Study phase, with a proposed commercial operation date of February 18, 2031. The project is being developed within the Pacific Gas & Electric (PGAE) service area. The project has appeared in recent news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Solano
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Lambie 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- LAMBGT1_7_B1
- POI Substation
- Lambie Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
BRUSHY in ISO New England queue pipeline — 1 projects by technology and status
Data-driven briefing on BRUSHY — fleet, generation, financial, and news signals.
BRUSHY queue pipeline — 1 projects by technology and status
Data-driven briefing on BRUSHY — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.