WATER ROCK SOLAR 1 (CAISO-1801) — Project Summary

Queue ID
CAISO-1801
Capacity
400 MW
Technology
Solar+Battery
Status
active
Location
Nye, NV
Region
CAISO
Developer
—
IA Status
IA Executed

WATER ROCK SOLAR 1

CAISO-1801BetaActiveSolarBatteryCAISOLBNL + Live

400 MW hybrid in Nye, NV · In queue since April 2020 · Proposed COD December 2027

BA: NEVPISO/RTO: CAISONERC: WECCRC: SPPW

400 MW

Capacity

2

Components

Solar + Battery

6y 7m

In Queue

IA Executed

IA Phase

Signed Aug 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 4m

IA → COD

3y 4m

Total Duration

4y 4m

Study Phase

C13

Construction75%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementAug 2, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C13

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-12-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 1, 2027
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue with an executed interconnection agreement (2024-08-02) at Gamebird 230 kV substation. No construction or financing news found. Aggregators list 200 MW against LBNL's 400 MW.
Financing
Not recorded

Milestones in this assessment

IA executedAug 2, 2024Latest in this assessment

Interconnection agreement signed (date from LBNL; AMCompute confirms 'Agreement signed' status).

amcompute.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/nevada/1801_storage/water-rock-solar-1
  2. interconnection.fyi/project/caiso-1801
  3. amcompute.com/data-center-site-finder/nevada
  4. cleanview.co/power-projects/planned/battery-storage-projects/nevada/2146_storage/water-rock-solar-2

Commercial operation date: The LBNL proposed COD is 2027-12-01. Cleanview says 'Expected online 2027' and AMCompute lists 'in service 2027-12', but both look like aggregator echoes of the queue data rather than independent developer confirmation.

Developer: The LBNL developer field is null and no press release or article names a developer. A Cleanview snippet mentions 'Ares Nevada' next to Water Rock Solar 1, but the snippet is too ambiguous to attribute it as the developer.

Status: LBNL shows status active with IA Executed. Interconnection.fyi lists it as active in CAISO and AMCompute says 'Agreement signed'. No source indicates withdrawal or construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The WATER ROCK SOLAR 1 project is a proposed 400 MW hybrid solar and battery energy storage development in Nye County, Nevada. The project, which consists of 200 MW of solar generation and 200 MW of battery storage, is located within the California Independent System Operator (CAISO) region. The project's queue ID is CAISO-1801, and it entered the interconnection queue on April 15, 2020. The proposed commercial operation date is December 1, 2027, and the Interconnection Agreement (IA) has been executed. The point of interconnection is the Gamebird Substation 230 kV.

WATER ROCK SOLAR 1 has been the subject of recent news coverage, with three articles categorized as regulatory and industry news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

NV

County

Nye

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

GLW

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Gamebird Substation 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar200 MW · 50%
Battery200 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
POI Substation
Gamebird Switchard

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.