OVERNIGHT SOLAR
300 MW hybrid in San Bernardino, CA · In queue since April 2020 · Proposed COD May 2027
300 MW
Capacity
2
Components
Solar + Battery
6y 3m
In Queue
IA Executed
IA Phase
Signed Feb 2024
Queue → IA
3y 10m
IA → COD
3y 3m
Total Duration
3y 10m
Study Phase
C13
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2027-05-01
OVERNIGHT SOLAR is a proposed hybrid solar and battery project located in San Bernardino County, California, with a total capacity of 300 MW. The project consists of 150 MW of solar generation and a 150 MW battery energy storage system. It is listed in the CAISO interconnection queue as entry CAISO-1774, with a queue entry date of April 15, 2020, and a proposed commercial operation date of May 1, 2027. The project's point of interconnection is the Kramer Substation 230kV, and the interconnecting utility is Southern California Edison (SCE).
The project's interconnection agreement (IA) has been executed as of February 17, 2024. Recent news coverage indicates interest in the project, with nine articles appearing in industry publications.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Bernardino
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Kramer Substation 230kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- KRAMER_1_N001
- POI Substation
- Kramer Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about OVERNIGHT SOLARForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.