GRACE ENERGY CENTER (CAISO-1761) — Project Summary

Queue ID
CAISO-1761
Capacity
1017.12 MW
Technology
Solar+Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
—
IA Status
IA Executed

GRACE ENERGY CENTER

CAISO-1761BetaActiveSolarBatteryCAISOLBNL + Live

1,017.12 MW hybrid in Riverside, CA · In queue since April 2020 · Proposed COD January 2027

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

1,017.12 MW

Capacity

2

Components

Solar + Battery

6y 7m

In Queue

IA Executed

IA Phase

Signed May 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 1m

IA → COD

3y 8m

Total Duration

3y 1m

Study Phase

C13

Construction75%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementMay 3, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C13

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-01-13

News-reported activity
as of 8y 6m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneconstruction completedpv magazine USA · 2018-05-29

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2027
Developer in saved assessment
—
Status at research time
Active
Active with IA executed (2023-05-03). The CEQA supplemental EIR was under review in early 2026 and no construction start is reported.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/california/1761_photovoltaic/grace-energy-center
  2. ceqanet.lci.ca.gov/2025010194/2
  3. aqmd.gov/docs/default-source/ceqa/comment-letters/2026/march-2026/odp260218-04-seir-grace-solar-energy-center-project.pdf?sfvrsn=84c6687e_3
  4. interconnection.fyi/eia/plant/69820

Commercial operation date: The South Coast AQMD EIR comment letter says "Construction is expected to take 28 months with operation starting as early as 2027," and Cleanview also lists "Expected online 2027," which matches the LBNL date of 2027-01-13. Phase 2 (the BESS) was still in CEQA review in Feb-Mar 2026, so 2027 looks optimistic and could slip. The source is year-only because no source gives a firmer date.

Developer: LBNL lists no developer. interconnection.fyi (EIA data) names the operator as the shell entity Grace Orchard Interconnection, LLC, and no source identifies a parent. The news-extracted NextEra Energy attribution comes from a 2018 pv magazine article about Pinal Central Solar in Arizona, a different project, so I rejected it as a false match.

Status: LBNL shows the project as active with an executed IA. The CEQA record (Jan 2025 filing, Feb 2026 update) and the AQMD EIR comments show the project is still in environmental permitting, not construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Grace Energy Center is a proposed 1017.12 MW hybrid solar and battery project located in Riverside County, California. The development project consists of 508.56 MW of solar generation and 508.56 MW of battery energy storage. Interconnection is being pursued through the CAISO queue under queue ID CAISO-1761, with an interconnection request date of April 15, 2020, and a proposed commercial operation date of January 13, 2027. The project has an executed Interconnection Agreement (IA) with Southern California Edison (SCE).

The Grace Energy Center has been the subject of recent news coverage, with 18 articles categorized as industry-related and regulatory.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Colorado River Substation 230kV

Data Source

LBNL + Live

DeveloperNextEra Energypv magazine USA · 2018-05-29
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar508.56 MW · 50%
Battery508.56 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CRIMSN_7_CN3
POI Substation
Colorado River Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles