HAWKINS SOLAR HYBRID (CAISO-1736) — Project Summary

Queue ID
CAISO-1736
Capacity
500 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
In Progress (unknown study)

HAWKINS SOLAR HYBRID

CAISO-1736BetaActiveSolarBatteryCAISOLBNL + Live

500 MW hybrid in Kern, CA · In queue since April 2020 · Proposed COD May 2027

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

500 MW

Capacity

2

Components

Solar + Battery

6y 3m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2027

Interconnection

Total Duration

7y 1m

Study Phase

C13

In Study38%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-01

Cross-source intelligence
Beta
Medium confidence·5 sources·as of 2026-06-01
Expected COD
May 2027
From queue filing
Developer
Status
Active
Active — in CAISO interconnection queue, Phase 2 study phase per CAISO 2023 briefing, no construction announcements
Financing
Unannounced
Key milestones
IA executedApr 2020Most recent

Entered CAISO queue as project 1736 in April 2020

source
About

The Hawkins Solar Hybrid project is a proposed 500 MW hybrid solar and battery energy storage development in Kern County, California. The project consists of a 250 MW solar photovoltaic array coupled with a 250 MW battery energy storage system. It is located within the California Independent System Operator (CAISO) region and is interconnected to the PG&E utility grid at the Arco 230 kV point of interconnection.

The project, identified as CAISO-1736 in the CAISO interconnection queue, entered the queue on April 15, 2020, with a proposed commercial operation date of May 1, 2027. The interconnection agreement status is currently listed as "In Progress (unknown study)". The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Arco 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar250 MW · 50%
Battery250 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
AGRICO_7_B1
POI Substation
Agrico

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.