HARQUAHALA SUNRISE (CAISO-1678) — Project Summary

Queue ID
CAISO-1678
Capacity
617.852 MW
Technology
Solar+Battery
Status
active
Location
Maricopa, AZ
Region
CAISO
Developer
—
IA Status
System Impact Study

HARQUAHALA SUNRISE

CAISO-1678BetaActiveSolarBatteryCAISOLBNL + Live

617.852 MW hybrid in Maricopa, AZ · In queue since April 2020 · Proposed COD April 2030

BA: AZPSISO/RTO: CAISONERC: WECCRC: SPPW

617.852 MW

Capacity

2

Components

Solar + Battery

6y 7m

In Queue

System Impact Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10 years

Study Phase

C13

Impact Study25%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

Active sheet; C13

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-04-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 1, 2030
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue at the System Impact Study stage with no IA date. Neighboring Harquahala Sun phases are operating, but there is no confirmed construction or permitting for this queue position.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. harquahalasun.com/
  2. copiapower.com/solar-operating-projects
  3. cleanview.co/power-projects/planned/solar-farms/arizona/1678_photovoltaic/harquahala-sunrise
  4. app.nrgmap.com/queues/caiso-1678

Commercial operation date: Only the LBNL proposed COD of 2030-04-01 is available for queue position 1678. Cleanview's "Expected online 2030" matches it but is probably derived from the same queue data, so it is not independent. The Copia/Harquahala Sun phases that are operating (2024-2025) cannot be tied to this queue ID, and the Phase IV filings are for a transmission line, not this generation.

Developer: LBNL lists no developer. The Harquahala Sun campus (Copia Power) uses the same Delaney 500 kV substation, county and naming, so Copia is a plausible developer. No source explicitly links CAISO-1678 to Copia, so it is not asserted.

Status: LBNL and the NRG Map listing both show the queue position as active. No source reports withdrawal, an executed IA or construction start for CAISO-1678.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Harquahala Sunrise project is a proposed 617.85 MW hybrid solar and battery energy storage project located in Maricopa County, Arizona. The development project consists of 308.93 MW of solar photovoltaic generation paired with 308.93 MW of battery storage. The project is in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-1678, with an entry date of April 15, 2020.

The proposed commercial operation date for Harquahala Sunrise is April 1, 2030. The project's interconnection point is the Delaney Substation 500 kV. The designated utility is DCRT. The project's interconnection status is currently in the System Impact Study phase. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AZ

County

Maricopa

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

DCRT

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Delaney Substation 500 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar308.926 MW · 50%
Battery308.926 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.