HOODINI (CAISO-1663) — Project Summary

Queue ID
CAISO-1663
Capacity
909.54 MW
Technology
Solar+Battery
Status
active
Location
Yuma, AZ
Region
CAISO
Developer
—
IA Status
System Impact Study

HOODINI

CAISO-1663BetaActiveSolarBatteryCAISOLBNL + Live

909.54 MW hybrid in Yuma, AZ · In queue since April 2019 · Proposed COD December 2031

BA: AZPSISO/RTO: CAISONERC: WECCRC: SPPW

909.54 MW

Capacity

2

Components

Solar + Battery

7y 7m

In Queue

System Impact Study

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

12y 8m

Study Phase

C12

Impact Study25%
Queue EntryApr 15, 2019

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

Active sheet; IA In Progress; C12

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-12-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2031
From queue filing
Developer in saved assessment
Eolus Vind (Eolus North America)
Status at research time
Active
Active in the CAISO queue (System Impact Study); the Yuma County Special Use Permit request was withdrawn in Nov 2023, with no construction or financing signals.
Financing
Not recorded

Milestones in this assessment

WithdrawnNov 6, 2023Latest in this assessment

Hoodini Solar withdrew its Yuma County Special Use Permit request at the Board of Supervisors meeting. This is a permit withdrawal, not a queue withdrawal.

kyma.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. kyma.com/news/kyma-com-category-news-yuma-county/2023/11/06/hoodini-solar-withdraws-special-use-permit-request/
  2. eolus.com/en/projects/hoodini/
  3. cleanview.co/power-projects/planned/battery-storage-projects/arizona/1663_storage/hoodini
  4. gridvisionai.com/retrospectives/caiso-hoodoo-wash

Commercial operation date: Only the LBNL/CAISO queue date (2031-12-31) exists. Cleanview's 'expected to come online in December 2031' repeats the queue data rather than giving an independent developer target. No press release or financing-backed COD was found.

Developer: The LBNL developer field is blank, so there is nothing to compare against. The Eolus project pages list Hoodini as an Eolus project, and Eolus is also the seller of the Pome BESS. The CAISO document's 'EO' tag may refer to Eolus, but this is inferred. Current ownership has not been confirmed.

Status: The queue listing still shows the project as active, and a Sep 2026 queue retrospective says it is 'still in queue'. The local permitting setback means the project is not advancing visibly, but it has not been withdrawn from the queue.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed HOODINI project is a 572.17 MW hybrid solar and battery energy storage development project located in Yuma County, Arizona. The project consists of a 459.54 MW solar component and a 112.63 MW battery energy storage system. It is interconnected to the San Diego Gas & Electric (SDGE) utility via the Hoodoo Wash Switchyard 500 kV.

The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-1663, with a queue entry date of April 15, 2019. The proposed commercial operation date is January 31, 2028. The project's interconnection status is currently in the System Impact Study phase.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AZ

County

Yuma

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SDGE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

Hoodoo Wash Switchyard 500 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar459.54 MW · 51%
Battery450 MW · 49%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.