DOUBLE BUTTE STORAGE (CAISO-1646) — Project Summary

Queue ID
CAISO-1646
Capacity
507.6 MW
Technology
Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
—
IA Status
IA Executed

DOUBLE BUTTE STORAGE

CAISO-1646BetaActiveBatteryCAISOLBNL + Live

507.6 MW storage in Riverside, CA · In queue since April 2019 · Proposed COD July 2030

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

507.6 MW

Capacity

1

Components

Battery

7y 7m

In Queue

IA Executed

IA Phase

Signed Sep 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

5y 5m

IA → COD

5y 10m

Total Duration

5y 5m

Study Phase

C12

Construction75%
Queue EntryApr 15, 2019

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementSep 10, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C12

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2030-07-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 1, 2030
From queue filing
Developer in saved assessment
AES
From queue filing
Status at research time
IA Executed
Active in the CAISO queue with an IA executed 2024-09-10. In local permitting: the City of Menifee MND was received March 2026 and a Planning Commission hearing is set for April 22, 2026. Not yet under construction.
Financing
Not recorded

Milestones in this assessment

IA executedSep 10, 2024

LBNL records the interconnection agreement as executed 2024-09-10; the cited page covers the queue entry.

interconnection.fyi
COD targetJul 1, 2030Latest in this assessment

The CAISO queue lists a proposed completion date of July 1, 2030.

interconnection.fyi
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. aes.com/sustainability-impact/people-communities/projects/double-butte-energy-storage-project
  2. ceqanet.lci.ca.gov/2026030538
  3. menifee247.com/2026/03/second-battery-energy-storage-facility-proposed-for-menifee.html
  4. cleanview.co/power-projects/planned/battery-storage-projects/california/1646_storage/double-butte-storage
  5. interconnection.fyi/project/caiso-1646

Commercial operation date: LBNL proposed COD is 2030-07-01, and Cleanview ('Expected online 2030') and interconnection.fyi (July 1, 2030) match it. No developer press release gives a different date, though the aggregators likely just mirror the queue data. The Idaho Power news facts concern a different project and were ignored.

Developer: The LBNL developer field is null. AES's project page describes Double Butte as its proposed battery storage facility in Menifee, CA, which identifies the operating company. The LBNL filing LLC is unknown, so no shell-to-parent mapping can be stated.

Status: LBNL shows an active queue entry with an executed IA. CEQA and Menifee Planning Commission documents show the project is still in entitlement, with no construction evidence.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Double Butte Storage project is a proposed 507.6 MW battery storage project located in Riverside County, California. Interconnecting to Southern California Edison (SCE), the project is in the California Independent System Operator (CAISO) queue as queue ID CAISO-1646, with an interconnection queue entry date of April 15, 2019. The proposed commercial operation date is July 1, 2030, and the Interconnection Agreement (IA) has been executed.

The Double Butte Storage project has been the subject of recent news coverage, with 14 articles categorized as regulatory, industry, deals, grid, and development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Valley Substation 500 kV

Data Source

LBNL + Live

ApplicantIdaho PowerEnergy-Storage.News · 2025-01-07
AgencyIdaho Public Utilities CommissionEnergy-Storage.News · 2025-01-07
RulingApprovalEnergy-Storage.News · 2025-01-07
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
GRNVALY_1_N025
POI Substation
Green Valley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.