ANGELENO SOLAR FARM
2,300 MW hybrid in Los Angeles, CA · In queue since April 2019 · Proposed COD December 2028
2,300 MW
Capacity
2
Components
Solar + Battery
7y 7m
In Queue
IA Executed
IA Phase
Signed Jul 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
6y 3m
IA → COD
3y 5m
Total Duration
6y 3m
Study Phase
C12
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C12
Project under construction
Typical: 18–30 months
Proposed COD: 2028-12-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-1625
- cleanview.co/power-projects/planned/battery-storage-projects/california/1625_storage/angeleno-solar-farm
- interxdata.com/projects/angeleno-solar-farm-caiso-public-queue-1625/
Commercial operation date: Only the LBNL proposed COD of 2028-12-31 is available. Aggregator pages (interconnection.fyi: 'proposed completion date is December 31, 2028'; Cleanview: 'Expected Online: December 2028') mirror the queue data. They are not independent developer or press confirmation.
Developer: The LBNL developer field is null and no search result names a developer or parent for Angeleno Solar Farm. The Coval Infrastructure article does not mention this project, so it is not linked.
Status: LBNL shows status 'active' with ia_status 'IA Executed' (2025-07-30). Aggregator listings (interxdata) also show the project as active, and nothing indicates withdrawal or suspension.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Angeleno Solar Farm is a proposed 2300 MW hybrid solar and battery project located in Los Angeles County, California. The development project, which has appeared in recent news, consists of 1150 MW of solar generation and 1150 MW of battery energy storage. It is listed in the CAISO interconnection queue as CAISO-1625, with an entry date of April 15, 2019, and a proposed commercial operation date of December 31, 2028.
The project's interconnection agreement (IA) was executed on January 28, 2022. The point of interconnection is the Vincent Substation 500kV.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Los Angeles
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Vincent Substation 500kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- VINCENT_2_N101
- POI Substation
- Vincent Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesSolar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.