ANGELENO SOLAR FARM (CAISO-1625) — Project Summary

Queue ID
CAISO-1625
Capacity
2300 MW
Technology
Solar+Battery
Status
active
Location
Los Angeles, CA
Region
CAISO
Developer
—
IA Status
IA Executed

ANGELENO SOLAR FARM

CAISO-1625BetaActiveSolarBatteryCAISOLBNL + Live

2,300 MW hybrid in Los Angeles, CA · In queue since April 2019 · Proposed COD December 2028

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

2,300 MW

Capacity

2

Components

Solar + Battery

7y 7m

In Queue

IA Executed

IA Phase

Signed Jul 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

6y 3m

IA → COD

3y 5m

Total Duration

6y 3m

Study Phase

C12

Construction75%
Queue EntryApr 15, 2019

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJul 30, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C12

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-12-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
—
Status at research time
IA Executed
Active in the CAISO queue with an interconnection agreement executed 2025-07-30 per LBNL. The proposed POI is Vincent Substation 500kV, and there is no public sign of construction start.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/caiso-1625
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/1625_storage/angeleno-solar-farm
  3. interxdata.com/projects/angeleno-solar-farm-caiso-public-queue-1625/

Commercial operation date: Only the LBNL proposed COD of 2028-12-31 is available. Aggregator pages (interconnection.fyi: 'proposed completion date is December 31, 2028'; Cleanview: 'Expected Online: December 2028') mirror the queue data. They are not independent developer or press confirmation.

Developer: The LBNL developer field is null and no search result names a developer or parent for Angeleno Solar Farm. The Coval Infrastructure article does not mention this project, so it is not linked.

Status: LBNL shows status 'active' with ia_status 'IA Executed' (2025-07-30). Aggregator listings (interxdata) also show the project as active, and nothing indicates withdrawal or suspension.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Angeleno Solar Farm is a proposed 2300 MW hybrid solar and battery project located in Los Angeles County, California. The development project, which has appeared in recent news, consists of 1150 MW of solar generation and 1150 MW of battery energy storage. It is listed in the CAISO interconnection queue as CAISO-1625, with an entry date of April 15, 2019, and a proposed commercial operation date of December 31, 2028.

The project's interconnection agreement (IA) was executed on January 28, 2022. The point of interconnection is the Vincent Substation 500kV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Los Angeles

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Vincent Substation 500kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar1,150 MW · 50%
Battery1,150 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
VINCENT_2_N101
POI Substation
Vincent Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.