KINGSROAD HYBRID SOLAR
203.56 MW hybrid in Kern, CA · In queue since April 2019 · Proposed COD December 2028
203.56 MW
Capacity
2
Components
Solar + Battery
7y 7m
In Queue
IA Executed
IA Phase
Signed May 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
6y 1m
IA → COD
3y 7m
Total Duration
6y 1m
Study Phase
C12
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C12
Project under construction
Typical: 18–30 months
Proposed COD: 2028-12-01
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with CAISO
caiso.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- caiso.com/documents/generator-interconnection-resource-id-report.xlsx
- cleanview.co/power-projects/planned/battery-storage-projects/california/1587_storage/kingsroad-hybrid-solar
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
- caiso.com/Documents/Briefing-ResourcesAvailable-NearTermInterconnection.pdf
Commercial operation date: LBNL queue snapshot shows proposed COD of December 2028. Multiple sources (Cleanview, CAISO Resource ID Report) confirm this 2028 target, with no contradictory recent announcements found in search results.
Developer: LBNL snapshot shows null developer. No press releases, corporate announcements, or ownership information found in search results. Project appears in queue tracking databases but without developer attribution.
Status: LBNL shows 'active' status with IA executed on 2025-05-28. CAISO Resource ID Report (May 2026) confirms active status. No withdrawal, suspension, or construction-start announcements found.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The KINGSROAD HYBRID SOLAR project is a proposed 203.56 MW hybrid solar and battery energy storage project located in Kern County, California. The development project consists of 101.78 MW of solar photovoltaic generation paired with 101.78 MW of battery energy storage. The project is interconnected within the California Independent System Operator (CAISO) queue as queue ID CAISO-1587, having entered the queue on April 15, 2019.
The proposed commercial operation date is December 1, 2028. The project has an executed Interconnection Agreement (IA), dated February 14, 2023, and will interconnect at the Arco 230 kV point of interconnection. The project is within the Pacific Gas & Electric (PGAE) service area.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
ERIS
Point of Interconnection
Arco 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.