DYNAMO SOLAR
24.5 MW generation in Napa, CA · In queue since April 2019 · Proposed COD July 2027
24.5 MW
Capacity
1
Components
Solar
7y 1m
In Queue
IA Executed
IA Status
Signed Sep 2021
Queue → IA
2y 5m
IA → COD
5y 10m
Total Duration
2y 5m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-07-16
Forward-looking exposure analytics for this queue project — climate hazards, expected generation variability, counterparty risk — into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
The Dynamo Solar project is a proposed 24.5 MW solar generation project located in Napa County, California. The project is interconnected within the CAISO region and is listed in the CAISO interconnection queue as entry CAISO-1565, with a queue entry date of April 15, 2019. The proposed commercial operation date is July 16, 2027.
The project's Interconnection Agreement (IA) was executed on September 13, 2021. The point of interconnection is the Tulucay 60 kV substation. The Dynamo Solar project is linked to the existing Dynamo Solar LLC operating plant (EIA plant ID 68528). The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Napa
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Tulucay 60 kV
Data Source
LBNL + Live
Forward-looking generation outlook for this queue project with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR bands, and refinancing risk for this queue project, projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- TULUCAY_6_N001
- POI Substation
- Tulucay Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about DYNAMO SOLARForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.