RECLAIMED WIND
114.4 MW storage in Alameda, CA · In queue since April 2018 · Proposed COD December 2026
114.4 MW
Capacity
1
Components
Battery
8y 7m
In Queue
IA Executed
IA Phase
Signed Mar 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 11m
IA → COD
4y 9m
Total Duration
3y 11m
Study Phase
C11
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C11
Project under construction
Typical: 6–18 months
Proposed COD: 2026-12-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Reclaimed Wind LLC filed CEC opt-in application for Viracocha Hill BESS (362.8 MWh / ~90.7 MW at POI)
efiling.energy.ca.govExpected online December 2026 per Cleanview, consistent with LBNL proposed COD
cleanview.coResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- energy.ca.gov/powerplant/battery-storage-system/viracocha-hill-battery-energy-storage-system-project
- cleanview.co/power-projects/planned/battery-storage-projects/caiso
- efiling.energy.ca.gov/GetDocument.aspx?tn=261767&DocumentContentId=98234
- caiso.com/documents/list-of-large-generator-interconnection-agreements-and-small-generator-interconnection-agreements.pdf
Commercial operation date: LBNL proposed COD of 2026-12-01 is independently corroborated by cleanview.co, which lists 'Expected Online: December 2026' for this 114 MW Alameda, CA battery project under developer Ignis.
Developer: CAISO LGIA list and CEC opt-in filings confirm the project legal entity is Reclaimed Wind LLC; cleanview.co identifies the parent developer as 'Ignis' (likely Ignis Energy) for this Alameda, CA 114 MW BESS. LBNL listed no developer.
Status: LBNL confirms IA Executed status with IA date 2022-03-12 confirmed by CAISO LGIA list; CEC opt-in application filed Feb 14, 2025 confirms active permitting progress consistent with a Dec 2026 target.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
RECLAIMED WIND is a proposed 114.4 MW battery storage project located in Alameda County, California. The project is interconnected to the CAISO grid under queue ID CAISO-1461. Its queue entry date is April 16, 2018, and the proposed commercial operation date is December 1, 2026. The interconnection agreement for the project was executed on March 12, 2022.
The project, which will connect to the Kelso-Tesla Tap 230 kV, has been featured in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Alameda
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Kelso-Tesla Tap 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesNo Ask reports yet for this entity.
Ask about RECLAIMED WINDForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.