JANUS
163.54 MW hybrid in Colusa, CA · In queue since April 2018 · Proposed COD April 2027
163.54 MW
Capacity
2
Components
Solar + Battery
8y 7m
In Queue
IA Executed
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9 years
Study Phase
C11
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C11
Project under construction
Typical: 18–30 months
Proposed COD: 2027-04-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
CAISO Interconnection Agreement executed for CAISO-1455; RWE developing 80 MW solar + 320 MWh BESS in Colusa County, CA
americas.rwe.comJanus Solar PV, LLC filed Use Permit application with Colusa County; Draft EIR released for public review and comment (CEQA pre-approval stage)
ceqanet.lci.ca.govLBNL queue lists proposed COD of 2027-04-01; county project page confirms active development
countyofcolusaca.govResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- americas.rwe.com/our-energy/solar-energy/solar-projects-and-locations/janus-solar-and-bess/
- countyofcolusaca.gov/996/Janus-Solar-and-Battery-Storage-Project
- ceqanet.lci.ca.gov/2024061043/7
- cal-cca.org/pioneer-community-energy-commits-nearly-2-billion-in-power-purchase-agreements-to-three-california-solar-storage-projects/
Commercial operation date: Only the LBNL queue snapshot provides a COD of 2027-04-01; RWE's project page describes Janus as 'currently in development' with no target date cited, and a 2027 COD appears aggressive given the Draft EIR was still in public review as of late 2024.
Developer: RWE's Americas website explicitly lists the Janus Solar and BESS project (80 MW / 320 MWh, Colusa County, CA) as one of its solar development assets; CEQAnet (Nov 2024) identifies the county Use Permit applicant as 'Janus Solar PV, LLC', a project-level shell entity under RWE.
Status: LBNL confirms IA Executed and Active queue status; Colusa County's official project page and CEQAnet corroborate active CEQA/permitting process with Draft EIR under review as of November 2024.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The JANUS project is a proposed 163.54 MW hybrid solar and battery energy storage project located in Colusa County, California. The development project consists of an 83.54 MW solar component and an 80 MW battery energy storage system. It is interconnected to the PG&E utility network within the CAISO region.
The project, identified as CAISO-1455 in the CAISO interconnection queue, entered the queue on April 16, 2018, and has a proposed commercial operation date of March 1, 2027. The interconnection agreement (IA) for the project has been executed. The point of interconnection (POI) is the Cortina 60 kV substation. The project has been mentioned in recent news coverage related to the energy industry.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Colusa
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Cortina 60 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- CORTINA_1_N106
- POI Substation
- Cortina Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.