JANUS (CAISO-1455) — Project Summary

Queue ID
CAISO-1455
Capacity
163.54 MW
Technology
Solar+Battery
Status
active
Location
Colusa, CA
Region
CAISO
Developer
—
IA Status
IA Executed

JANUS

CAISO-1455BetaActiveSolarBatteryCAISOLBNL + Live

163.54 MW hybrid in Colusa, CA · In queue since April 2018 · Proposed COD April 2027

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

163.54 MW

Capacity

2

Components

Solar + Battery

8y 7m

In Queue

IA Executed

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9 years

Study Phase

C11

Construction75%
Queue EntryApr 16, 2018

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C11

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-04-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 1, 2027
From queue filing
Developer in saved assessment
RWE
Filed as Janus Solar PV, LLC
Status at research time
IA Executed
IA Executed — active county permitting underway; Colusa County released a Draft EIR for public review as of late 2024 and a Use Permit application is pending; project not yet in construction.
Financing
Not recorded

Milestones in this assessment

IA executed

CAISO Interconnection Agreement executed for CAISO-1455; RWE developing 80 MW solar + 320 MWh BESS in Colusa County, CA

americas.rwe.com
Permit approvedNov 2024

Janus Solar PV, LLC filed Use Permit application with Colusa County; Draft EIR released for public review and comment (CEQA pre-approval stage)

ceqanet.lci.ca.gov
COD targetApr 1, 2027Latest in this assessment

LBNL queue lists proposed COD of 2027-04-01; county project page confirms active development

countyofcolusaca.gov
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. americas.rwe.com/our-energy/solar-energy/solar-projects-and-locations/janus-solar-and-bess/
  2. countyofcolusaca.gov/996/Janus-Solar-and-Battery-Storage-Project
  3. ceqanet.lci.ca.gov/2024061043/7
  4. cal-cca.org/pioneer-community-energy-commits-nearly-2-billion-in-power-purchase-agreements-to-three-california-solar-storage-projects/

Commercial operation date: Only the LBNL queue snapshot provides a COD of 2027-04-01; RWE's project page describes Janus as 'currently in development' with no target date cited, and a 2027 COD appears aggressive given the Draft EIR was still in public review as of late 2024.

Developer: RWE's Americas website explicitly lists the Janus Solar and BESS project (80 MW / 320 MWh, Colusa County, CA) as one of its solar development assets; CEQAnet (Nov 2024) identifies the county Use Permit applicant as 'Janus Solar PV, LLC', a project-level shell entity under RWE.

Status: LBNL confirms IA Executed and Active queue status; Colusa County's official project page and CEQAnet corroborate active CEQA/permitting process with Draft EIR under review as of November 2024.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The JANUS project is a proposed 163.54 MW hybrid solar and battery energy storage project located in Colusa County, California. The development project consists of an 83.54 MW solar component and an 80 MW battery energy storage system. It is interconnected to the PG&E utility network within the CAISO region.

The project, identified as CAISO-1455 in the CAISO interconnection queue, entered the queue on April 16, 2018, and has a proposed commercial operation date of March 1, 2027. The interconnection agreement (IA) for the project has been executed. The point of interconnection (POI) is the Cortina 60 kV substation. The project has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Colusa

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Cortina 60 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar83.54 MW · 51%
Battery80 MW · 49%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CORTINA_1_N106
POI Substation
Cortina Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.