DRIFTWOOD STELLA (CAISO-1394) — Project Summary

Queue ID
CAISO-1394
Capacity
400 MW
Technology
Solar+Battery
Status
withdrawn
Location
Kern, CA
Region
CAISO
Developer
—
IA Status
IA Executed

DRIFTWOOD STELLA

CAISO-1394BetaWithdrawnSolarBatteryCAISOLBNL + Live

400 MW hybrid in Kern, CA · In queue since May 2017 · Proposed COD November 2026

Withdrawn from the CAISO queue in July 2026, according to CAISO's queue (Oct 2026).

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

400 MW

Capacity

2

Components

Solar + Battery

9y 6m

In Queue

IA Executed

IA Phase

Signed Apr 2021

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 11m

IA → COD

5y 7m

Total Duration

3y 11m

Study Phase

C10

Queue EntryMay 1, 2017

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementApr 7, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 18–30 months

Commercial Operation

Proposed COD: 2026-11-01

WithdrawnWithdrawn

Project withdrew from interconnection queue

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. See the queue record for reported project facts.

Research COD
Nov 2026
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — IA executed April 2021, targeting November 2026 COD
Financing
Not recorded

Milestones in this assessment

IA executedApr 7, 2021

Interconnection Agreement executed with PG&E

eta-publications.lbl.gov
COD targetNov 2026Latest in this assessment

Target commercial operation date November 2026

caiso.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/california/1394_storage/driftwood-stella
  2. caiso.com/Documents/Briefing-ResourcesAvailable-NearTermInterconnection.pdf
  3. eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
  4. caiso.com/documents/publicqueuereport.xlsx
  5. docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M534/K048/534048570.PDF

Commercial operation date: LBNL queue shows November 2026 COD with IA executed April 2021. Multiple independent sources (Cleanview, CAISO public queue reports) confirm the same November 2026 target date. No contradictory signals found in research.

Developer: No developer information found in LBNL snapshot or any search results. All sources consulted (Cleanview, CAISO queue reports, regulatory filings) list developer as unknown or omitted.

Status: LBNL shows 'active' status with IA executed. CAISO December 2023 briefing and multiple 2024 regulatory filings confirm project remains in active queue with executed interconnection agreement.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

DRIFTWOOD STELLA is a proposed 391.4 MW hybrid solar and battery project located in Kern County, California. The development project consists of a 207.4 MW solar component and a 184 MW battery energy storage system. It is listed in the CAISO interconnection queue as queue ID CAISO-1394, with an entry date of May 1, 2017. The proposed commercial operation date is November 1, 2026.

The project has an executed interconnection agreement (IA), signed on April 7, 2021. The interconnecting utility is PG&E, and the point of interconnection (POI) is the Midway 115 kV substation. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

Midway 115 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar200 MW · 50%
Battery200 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
MIDWAY_1_N084
POI Substation
Midway Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.