Project BPA-G1074 — Project Summary

Queue ID
BPA-G1074
Capacity
111 MW
Technology
Wind
Status
active
Location
Gilliam, OR
Region
West
Developer
—
IA Status
In Progress (unknown study)

BPA-G1074

BPA-G1074BetaActiveWindBPALBNL

111 MW generation in Gilliam, OR · In queue since February 2025 · Proposed COD June 2027

BA: BPATNERC: WECCRC: RCW

111 MW

Capacity

1

Components

Wind

1y 9m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 4m

In Study38%
Queue EntryFeb 14, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-30

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

BPA-G1074 is a proposed 111 MW wind generation project located in Gilliam County, Oregon, in the western United States. The development project consists of a single wind component with a capacity of 111 MW. No developer or project name has been publicly identified in the available queue data, so the project is referenced by its queue identifier.

The project is in the interconnection queue administered by the Bonneville Power Administration (BPA), which it entered on February 14, 2025, and it currently holds active status. It has requested Energy Resource Interconnection Service (ERIS), with a proposed point of interconnection at the Jones Canyon Substation at 230 kV. The project's interconnection agreement status is listed as in progress, though the specific study phase has not been identified. The proposed commercial operation date is June 30, 2027.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OR

County

Gilliam

Grid Region

Mountain West

Market

—

Developer

—

Utility

—

Entity

BPA

Service Type

ERIS

Point of Interconnection

Jones Canyon Substation at 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.