Project BPA-G0840 — Project Summary

Queue ID
BPA-G0840
Capacity
600 MW
Technology
Solar+Battery
Status
active
Location
Douglas, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0840

BPA-G0840BetaActiveSolarBatteryBPALBNL

600 MW hybrid in Douglas, WA · In queue since February 2023 · Proposed COD December 2027

BA: BPATNERC: WECCRC: RCW

600 MW

Capacity

2

Components

Solar + Battery

3y 5m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2027

Interconnection

Total Duration

4y 10m

Study Phase

Transition Cluster

In Study38%
Queue EntryFeb 7, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

BPA-G0840 is a proposed 600 MW hybrid solar and battery project located in Douglas County, Washington. The project, consisting of 300 MW of solar generation and 300 MW of battery energy storage, is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of February 7, 2023. The proposed commercial operation date is December 31, 2027.

The interconnection agreement (IA) status for BPA-G0840 is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Chief Joseph-Sickler No 1 500kV line.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

WA

County

Douglas

Grid Region

Mountain West

Market

Developer

Utility

Entity

BPA

Service Type

NRIS/ERIS

Point of Interconnection

Chief Joseph-Sickler No 1 500kV line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar300 MW · 50%
Battery300 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.