BPA-G0834
450 MW hybrid in Umatilla, OR · In queue since December 2022 · Proposed COD December 2027
450 MW
Capacity
3
Components
Solar + Wind + Battery
3y 5m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
5 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
BPA-G0834 is a proposed 450 MW hybrid Solar+Battery project located in Umatilla County, Oregon. The project, which appeared in recent news coverage, consists of 175 MW of solar, 175 MW of wind, and a 100 MW battery energy storage system. It is listed in the Bonneville Power Administration (BPA) interconnection queue with an entry date of December 30, 2022, and a proposed commercial operation date of December 1, 2027.
The interconnection agreement (IA) status for BPA-G0834 is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Lower Monumental-McNary No 1 500 kV line through a direct connection to a new 500 kV substation.
Generated from interconnection queue and public data sources
State
OR
County
Umatilla
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Lower Monumental-McNary No 1 500 kV line through a direct connection to a new 500 kV substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.