Project BPA-G0808 — Project Summary

Queue ID
BPA-G0808
Capacity
600 MW
Technology
Battery
Status
active
Location
Douglas, OR
Region
West
Developer
—
IA Status
In Progress (unknown study)

BPA-G0808

BPA-G0808BetaActiveBatteryBPALBNL

600 MW storage in Douglas, OR · In queue since September 2022 · Proposed COD December 2030

BA: BPATNERC: WECCRC: RCW

600 MW

Capacity

1

Components

Battery

4y 2m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 3m

Study Phase

Transition Cluster

In Study38%
Queue EntrySep 16, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-10

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

BPA-G0808 is a proposed 600 MW battery energy storage development project located in Douglas County, Oregon, in the western United States. The project consists of a single battery storage component with a capacity of 600 MW. No developer or project name has been publicly identified in the available interconnection data. The proposed point of interconnection is either the Bonneville Power Administration's (BPA) Gardiner 115 kV substation or its Tahkenitch 230 kV substation.

The project entered the BPA interconnection queue on September 16, 2022, and holds an active status. It is being evaluated as part of BPA's Transition Cluster study phase and has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). Its interconnection agreement status is listed as in progress, though the specific study stage has not been reported. The proposed commercial operation date is December 10, 2030.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OR

County

Douglas

Grid Region

Mountain West

Market

—

Developer

—

Utility

—

Entity

BPA

Service Type

NRIS/ERIS

Point of Interconnection

BPA's Gardiner 115 kV substation or Tahkenitch 230 kV substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.