Project BPA-G0753 — Project Summary

Queue ID
BPA-G0753
Capacity
515 MW
Technology
Solar+Battery
Status
active
Location
Douglas, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0753

BPA-G0753BetaActiveSolarBatteryBPALBNL

515 MW hybrid in Douglas, WA · In queue since June 2022 · Proposed COD December 2025

BA: BPATNERC: WECCRC: RCW

515 MW

Capacity

2

Components

Solar + Battery

4y 1m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2025

Interconnection

Total Duration

3y 6m

Schedule

6 months past proposed COD

Study Phase

Transition Cluster

In Study38%
Queue EntryJun 16, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

About

BPA-G0753 is a proposed 515 MW hybrid solar and battery project located in Douglas County, Washington. The development project consists of 215 MW of solar generation coupled with 300 MW of battery storage. It is listed in the Bonneville Power Administration interconnection queue as of June 16, 2022, with a proposed commercial operation date of December 31, 2025.

The interconnection agreement for BPA-G0753 is currently listed as "In Progress (unknown study)". The point of interconnection is the 5-mile 230kV Gen Tie to Columbia 230 kV Substation. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

WA

County

Douglas

Grid Region

Mountain West

Market

Developer

Utility

Entity

BPA

Service Type

ERIS

Point of Interconnection

5-mile 230kV Gen Tie to Columbia 230 kV Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar215 MW · 42%
Battery300 MW · 58%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.