Project BPA-G0693 — Project Summary

Queue ID
BPA-G0693
Capacity
300 MW
Technology
Battery
Status
active
Location
Crook, OR
Region
West
Developer
—
IA Status
In Progress (unknown study)

BPA-G0693

BPA-G0693BetaActiveOtherBatteryOther StorageBPALBNL

300 MW hybrid in Crook, OR · In queue since September 2021 · Proposed COD December 2025

BA: BPATNERC: WECCRC: RCW

300 MW

Capacity

3

Components

Other + Battery + Other Storage

5y 2m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 3m

Schedule

12 months past proposed COD

Study Phase

Transition Cluster

In Study38%
Queue EntrySep 22, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

BPA-G0693 is a proposed hybrid energy development project located in Crook County, Oregon, in the western United States. The project has a total capacity of 300 MW, divided equally among three components: 100 MW of battery storage, 100 MW of other storage, and 100 MW classified as an "other" technology type. No developer is identified in the available data. The project would connect to the grid at the Ponderosa Substation at the 500 kV level.

The project is in the interconnection queue of the Bonneville Power Administration (BPA), which it entered on September 22, 2021. It remains active and is being studied as part of BPA's Transition Cluster. It has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). The interconnection agreement is listed as in progress, though the specific study stage is not identified. The proposed commercial operation date is December 1, 2025.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OR

County

Crook

Grid Region

Mountain West

Market

—

Developer

—

Utility

—

Entity

BPA

Service Type

NRIS/ERIS

Point of Interconnection

Ponderosa Substation 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Other100 MW · 33%
Battery100 MW · 33%
Other Storage100 MW · 33%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.