BPA-G0566
646 MW generation in Lincoln, MT · In queue since June 2017 · Proposed COD September 2022
646 MW
Capacity
1
Components
Hydro
8y 11m
In Queue
Facility Study
IA Status
COD target: 2022
Total Duration
5y 3m
Schedule
44 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-09-30
Forward-looking exposure analytics for this queue project — climate hazards, expected generation variability, counterparty risk — into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
BPA-G0566 is a proposed hydroelectric generation project with a total capacity of 646 MW, located in Lincoln County, Montana. The project is listed in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of June 5, 2017. The proposed commercial operation date is September 30, 2022. The project's interconnection status is currently in the Facility Study phase.
The development project consists solely of hydroelectric generation, with all 646 MW of capacity attributed to this technology. It is listed under the utility and entity of Bonneville Power Administration (BPA).
Generated from interconnection queue and public data sources
State
MT
County
Lincoln
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Data Source
LBNL
Forward-looking generation outlook for this queue project with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR bands, and refinancing risk for this queue project, projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project BPA-G0566Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.