BPA-G0505
20 MW generation in Lincoln, OR · In queue since January 2015 · Proposed COD January 2017
20 MW
Capacity
1
Components
Other
11y 6m
In Queue
Facility Study
IA Phase
COD target: 2017
Total Duration
2 years
Schedule
116 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2017-01-01
The proposed BPA-G0505 project is a 20 MW wave energy generation project located in Lincoln County, Oregon. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of January 12, 2015. Its proposed commercial operation date is January 1, 2017. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection (POI) is located on the 12.47 kV distribution line between SS162 Seal Rock and SS163 Lundy, approximately 2.5 miles south of Seal Rock.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OR
County
Lincoln
Grid Region
Mountain West
Market
—
Developer
—
Utility
—
Entity
BPA
Service Type
ERIS
Point of Interconnection
Located on the 12.47 kV distribution line between SS162 Seal Rock and SS163 Lundy, approximately 2.5 miles south of Seal Rock.
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project BPA-G0505Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.