Project BPA-G0478 — Project Summary

Queue ID
BPA-G0478
Capacity
500 MW
Technology
Solar+Battery
Status
active
Location
Morrow, OR
Region
West
Developer
IA Status
Facility Study

BPA-G0478

BPA-G0478BetaActiveSolarBatteryBPALBNL

500 MW hybrid in Morrow, OR · In queue since September 2012 · Proposed COD November 2016

BA: BPATNERC: WECCRC: RCW

500 MW

Capacity

2

Components

Solar + Battery

13y 10m

In Queue

Facility Study

IA Phase

COD target: 2016

Interconnection

Total Duration

4y 2m

Schedule

118 months past proposed COD

Facilities Study50%
Queue EntrySep 6, 2012

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2016-11-01

About

The proposed BPA-G0478 project is a 500 MW hybrid solar and battery energy storage development in Morrow County, Oregon. The project consists of a 300 MW solar array coupled with a 200 MW battery energy storage system. It is located in the Bonneville Power Administration (BPA) service area within the Western interconnection region.

The project is currently in the BPA interconnection queue with an entry date of September 6, 2012 and a proposed commercial operation date of November 1, 2016. Its interconnection status is listed as "Facility Study". The point of interconnection (POI) is BPA's proposed Longhorn 500/230 kV Substation.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OR

County

Morrow

Grid Region

Mountain West

Market

Developer

Utility

Entity

BPA

Service Type

NRIS/ERIS

Point of Interconnection

BPA's proposed Longhorn 500/230 kV Substation.

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar300 MW · 60%
Battery200 MW · 40%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.