Project BHP-BHBE G7 — Project Summary

Queue ID
BHP-BHBE G7
Capacity
200 MW
Technology
Wind
Status
active
Location
Campbell, SD
Region
West
Developer
Third Planet Wind
IA Status
IA Executed

BHP-BHBE G7

BHP-BHBE G7BetaActiveWindBHPLBNL

200 MW generation in Campbell, SD · In queue since October 2007 · Proposed COD September 2010

BA: WACMNERC: MRORC: SPP

200 MW

Capacity

1

Components

Wind

19y 1m

In Queue

IA Executed

IA Phase

COD target: 2010

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 11m

Schedule

198 months past proposed COD

Construction75%
Queue EntryOct 1, 2007

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2010-09-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
—
From queue filing
Developer in saved assessment
Third Planet Wind
From queue filing
Status at research time
Active
Active — IA Executed but no construction or operational updates since 2007 queue entry; likely stalled or indefinitely delayed
Financing
Not recorded

Milestones in this assessment

IA executedLatest in this assessment

Interconnection Agreement executed per LBNL queue data, date unknown

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: LBNL proposed COD of 2010-09-01 is 14+ years stale with no recent news or updates found. No current COD target available from research.

Developer: LBNL lists 'Third Planet Wind' as developer with no evidence of shell LLC structure or ownership changes. No recent news found to validate or update.

Status: LBNL shows 'active' with IA Executed, but 14-year gap between proposed COD (2010) and present with zero news coverage suggests project is dormant despite maintaining queue position.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

BHP-BHBE G7 is a proposed 200 MW wind generation project in Campbell County, South Dakota, in the western United States. The project is being developed by Third Planet Wind and consists of a single wind component with a capacity of 200 MW. It is planned to connect to the transmission system at the Pumpkin Buttes 230 kV point of interconnection, within the service territory of the utility Black Hills Power.

The project entered the Black Hills Power (BHP) interconnection queue on October 1, 2007, and holds an active status. It requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). The interconnection agreement for the project has been executed. The proposed commercial operation date was September 1, 2010, though the project remains listed as active in the queue well beyond that original target date.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

SD

County

Campbell

Grid Region

Mountain West

Market

—

Developer

Third Planet Wind

Utility

Black Hills Power

Entity

BHP

Service Type

NRIS/ERIS

Point of Interconnection

Pumpkin Buttes 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.