Project BHP-BHBE G5 — Project Summary

Queue ID
BHP-BHBE G5
Capacity
100 MW
Technology
Coal
Status
active
Location
Campbell, SD
Region
West
Developer
Basin Electric
IA Status
IA Executed

BHP-BHBE G5

BHP-BHBE G5BetaActiveCoalBHPLBNL

100 MW generation in Campbell, SD · In queue since May 2005 · Proposed COD January 2011

BA: WACMNERC: MRORC: SPP

100 MW

Capacity

1

Components

Coal

21y 6m

In Queue

IA Executed

IA Phase

COD target: 2011

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 8m

Schedule

194 months past proposed COD

Construction75%
Queue EntryMay 23, 2005

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–36 months

Commercial Operation

Proposed COD: 2011-01-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2011
From queue filing
Developer in saved assessment
Basin Electric Power Cooperative
From queue filing
Status at research time
Active
Active (IA Executed) — likely stale; 100 MW coal project queued in 2005 with 2011 COD is either operational and unreported in LBNL data, or quietly withdrawn given coal economics post-2011
Financing
Not recorded

Milestones in this assessment

IA executed2005Latest in this assessment

Interconnection Agreement executed (date unknown, inferred around queue date 2005-05-23)

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: LBNL proposed COD of 2011-01-01 is the only available date. Given the 2005 queue date and 'active' status with IA executed, this coal project is likely either operational (unreported) or cancelled, as a 13+ year delay is extreme.

Developer: LBNL lists 'Basin Electric' which is Basin Electric Power Cooperative, a major regional utility. No shell LLC structure evident, and no contradictory sources available.

Status: LBNL shows 'active' with IA executed but is_operational=false. A coal project with 2011 target COD that remains 'active' in 2025 is highly suspect given market conditions and regulatory environment for coal.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

BHP-BHBE G5 is a proposed 100 MW coal-fired generation project located in Campbell County, South Dakota, in the western United States. The project is being developed by Basin Electric and consists of a single 100 MW coal generation component. Its proposed point of interconnection is the Hughes 230 kV substation, within the transmission system of Black Hills Power.

The project is listed in the interconnection queue administered by Black Hills Power (BHP), which it entered on May 23, 2005. It requested Network Resource Interconnection Service (NRIS), and its interconnection agreement has been executed. The project's proposed commercial operation date was January 1, 2011. That date has passed, but the queue entry is still listed as active.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

SD

County

Campbell

Grid Region

Mountain West

Market

—

Developer

Basin Electric

Utility

Black Hills Power

Entity

BHP

Service Type

NRIS

Point of Interconnection

Hughes 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project BHP-BHBE G5
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.