BHP-BHBE G4
300 MW generation in Campbell, SD · In queue since January 2005 · Proposed COD January 2011
300 MW
Capacity
1
Components
Coal
21y 10m
In Queue
IA Executed
IA Phase
COD target: 2011
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6 years
Schedule
194 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–36 months
Proposed COD: 2011-01-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only the LBNL snapshot is available, with proposed_cod 2011-01-01. No news or search findings corroborate or contradict it. The date is long past and the project is not operational, so it is likely stale, but nothing newer exists to replace it.
Developer: LBNL lists Basin Electric as the developer. No press releases or news were provided to confirm a different parent, shell LLC, or ownership change.
Status: LBNL reports status 'active' and ia_status 'IA Executed', with is_operational false. No external sources were provided to verify ground reality.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
BHP-BHBE G4 is a proposed 300 MW coal-fired generation project located in Campbell County, South Dakota, in the western region of the United States. The development project is being pursued by Basin Electric, with Black Hills Power serving as the interconnecting utility. The project consists of a single coal generation component totaling 300 MW and is proposed to connect to the grid at the Hughes 230 kV point of interconnection.
The project entered the Black Hills Power (BHP) interconnection queue on January 7, 2005, and remains listed with an active status. It has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date was January 1, 2011, and the project has an executed interconnection agreement (IA Executed).
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
SD
County
Campbell
Grid Region
Mountain West
Market
—
Developer
Basin Electric
Utility
Black Hills Power
Entity
BHP
Service Type
NRIS
Point of Interconnection
Hughes 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project BHP-BHBE G4Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.