Project APS-Q346 — Project Summary

Queue ID
APS-Q346
Capacity
45 MW
Technology
Solar
Status
suspended
Location
Maricopa, AZ
Region
West
Developer
—
IA Status
Suspended

APS-Q346

APS-Q346BetaSuspendedSolarAPSLBNL

45 MW generation in Maricopa, AZ · In queue since April 2020 · Proposed COD June 2021

BA: AZPSNERC: WECCRC: SPPW

45 MW

Capacity

1

Components

Solar

6y 7m

In Queue

Suspended

IA Phase

COD target: 2021

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 2m

Suspended38%
Queue EntryApr 30, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2021-06-22

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

APS-Q346 is a proposed 45 MW solar generation project located in Maricopa County, Arizona, in the western United States. No project name or developer has been disclosed in the available queue data, so the project is identified by its queue ID. The proposed facility would consist of a single solar component with a capacity of 45 MW and would connect to the grid at the Komatke 69kV point of interconnection. The project requested Network Resource Interconnection Service (NRIS).

The project entered the interconnection queue administered by Arizona Public Service (APS) on April 30, 2020. It listed a proposed commercial operation date of June 22, 2021, a date that has since passed without the project reaching operation. The project's status in the queue is currently listed as suspended, and its interconnection agreement status is likewise recorded as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

AZ

County

Maricopa

Grid Region

Mountain West

Market

—

Developer

—

Utility

Arizona Public Service

Entity

APS

Service Type

NRIS

Point of Interconnection

Komatke 69kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project APS-Q346
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.