Search plants, projects, owners, and states
9.4 MW Hydro operating in Grant, WA
9.4 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1985
Operating Since
Coordinates
46.9827, -119.2578
County
Grant, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Columbia Basin Hydropower | — | — |
| Owner(s) | East Columbia Basin Irr Dist, Quincy-Columbia Basin Irr Dist, South Columbia Basin Irr Dist | — | — |
| Status | Operating | — | — |
Quincy Chute is a hydroelectric power plant located in Grant County, Washington. The plant, owned and operated by PUD No 2 of Grant County, began operating in 1985. It has a total capacity of 9.4 MW from a single generator utilizing conventional hydroelectric technology. The plant's primary fuel source is water (WAT).
In the most recent year of data, Quincy Chute generated 30,917 MWh of electricity, achieving a capacity factor of 37.4%. The plant operates within the Public Utility District No. 2 of Grant County, Washington balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Quincy Chute is ranked as the 54th largest power plant out of 75 in Washington state, and 679th out of 1464 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Public Utility District No. 2 of Grant County, Washington (GCPD)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
0 MWh
Latest Month
30.9K MWh
Annual Generation
37.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $21.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Quincy ChuteForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo