Search plants, projects, owners, and states
1015.5 MW Bit. Coal operating in Emery, UT
1,015.5 MW
Nameplate Capacity
2
Generators
units
Conventional Steam Coal
Technology
1974
Operating Since
Coordinates
39.3792, -111.0781
County
Emery, UT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | PacifiCorp | PacifiCorp | — |
| Owner(s) | PacifiCorp | Berkshire Hathaway | — |
| Status | Operating | — | — |
The Huntington power plant is located in Emery County, Utah. The plant has a total capacity of 1015.5 MW across two generators utilizing conventional steam coal technology and bituminous coal as its primary fuel. The plant began operating in 1974. PacifiCorp operates the facility, while Berkshire Hathaway is the parent company. Huntington is the third-largest power plant in Utah out of four total plants, and ranks 30th nationally out of 50 plants. The plant operates within the PacifiCorp - East balancing authority, which falls under the Western Electricity Coordinating Council (WECC) NERC region.
In the latest year of reported generation, Huntington produced 4,260,189 MWh of electricity, achieving a capacity factor of 48.0%. Financial data indicates an installed cost of $867.4 per kW, according to FERC and FERC EQRs. The plant also has a reported power purchase agreement (PPA) price of $10.78 per MWh.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
345.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
178.8K MWh
Latest Month
4.3M MWh
Annual Generation
48.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2387 lb/MWh
NOx
2 lb/MWh
SO₂
0.622 lb/MWh
CH₄
0.256 lb/MWh
N₂O
0.037 lb/MWh
Capacity Factor
38.2%
Annual Net Gen
3401 GWh
CO₂eq
2404 lb/MWh
Subregion
WECC Northwest
PacifiCorp · Data from 2015–2025
$10.8/MWh
PPA Price
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about HuntingtonForward forecasts, scenario decomposition, and risk-decision tooling for this asset.