Search plants, projects, owners, and states
26.6 MW Distillate Oil operating in Sangamon, IL
26.6 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
1973
Operating Since
Coordinates
39.8259, -89.6373
County
Sangamon, IL
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Springfield - (IL) | City of Springfield - (IL) | — |
| Owner(s) | City of Springfield - (IL) | City of Springfield - (IL) | — |
| Status | Operating | — | — |
The Factory power plant, located in Sangamon County, Illinois, has a total capacity of 26.6 MW. The plant began operating in 1973 and is owned and operated by the City of Springfield (IL). The primary fuel source is distillate fuel oil (DFO), and the plant utilizes petroleum liquid technology. It has one generator.
The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC NERC region. In the most recent year with available data, the plant generated 66 MWh, resulting in a capacity factor of 0.0%. The Factory plant is ranked 4th out of 35 similar plants in Illinois and 153rd out of 886 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
0 MWh
Latest Month
66 MWh
Annual Generation
0.0%
Capacity Factor
CO₂ Intensity
0 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
20 lb/MWh
SO₂
9 lb/MWh
CH₄
0.005 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
0.0%
Annual Net Gen
0 GWh
CO₂eq
0.402 lb/MWh
Subregion
SERC Midwest
2013
$765/kW
Est. Construction Cost
Total estimated cost: $20.3M
Market Position
ISO/RTO Market
MISO
LMP Node
CWLP.FACTOR91
Pricing Hub
ILLINOIS.HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
Last updated 2026-04-09
View all 10 articlesNo Ask reports yet for this entity.