4 MW Distillate Oil operating in Marshall, AL
4 MW
Nameplate Capacity
4
Generators
units
Petroleum Liquids
Technology
2000
Operating Since
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Albertville Municipal Utilities Board (AL) | — | — |
| Owner(s) | Albertville Municipal Utilities Board | — | — |
| Status | Operating | — | — |
The Albertville plant is a 4 MW electricity generating facility located in Marshall County, Alabama. It is owned and operated by the Albertville Municipal Utilities Board. The plant consists of 4 generators utilizing petroleum liquids, specifically distillate fuel oil (DFO), as its primary fuel source. The plant began operating in 2000.
The Albertville plant operates within the balancing authority of the Tennessee Valley Authority (TVA) and is located within the SERC Reliability Corporation NERC region. According to available rankings, the Albertville plant is the 3rd largest of 3 liquid fueled plants in the state of Alabama, and ranks 594th out of 886 similar plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
161.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$765/kW
Est. Construction Cost
Total estimated cost: $3.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about AlbertvilleForward forecasts, scenario decomposition, and risk-decision tooling for this asset.