8 MW Distillate Oil operating in Jackson, IA
8 MW
Nameplate Capacity
4
Generators
units
Petroleum Liquids
Technology
2001
Operating Since
Coordinates
42.0700, -90.6600
County
Jackson, IA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Maquoketa - (IA) | — | — |
| Owner(s) | City of Maquoketa - (IA) | — | — |
| Status | Operating | — | — |
Maquoketa 2 is a small petroleum-fueled power plant located in Jackson County, Iowa. The plant has a total capacity of 8 MW, distributed across four generators utilizing petroleum liquid technology. It commenced operations in 2001 and is owned and operated by the City of Maquoketa.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, situated in the Midwest Reliability Organization (MRO) NERC region. Maquoketa 2 is ranked as the 33rd largest power plant in Iowa out of 90, and nationally it holds a rank of 413 out of 886 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$765/kW
Est. Construction Cost
Total estimated cost: $6.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
ALTW.MQOKT.ARR
Pricing Hub
MINN.HUB
Alt. Hub / Zone
ILLINOIS.HUB
Location Type
Trading Hub
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Maquoketa 2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.