94 MW Natural Gas operating in Bronx, NY
94 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2001
Operating Since
Coordinates
40.7991, -73.9156
County
Bronx, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | New York Power Authority | New York Power Authority | — |
| Owner(s) | New York Power Authority | New York Power Authority | — |
| Status | Operating | — | — |
Harlem River Yard is a 94 MW natural gas-fired power plant located in Bronx County, New York. The plant began operating in 2001 and consists of two natural gas-fired combustion turbine generators. It is owned and operated by the New York Power Authority. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year of record, Harlem River Yard generated 109,705 MWh of electricity, resulting in a capacity factor of 13.2%. The plant is ranked as the 41st largest in New York state out of 102 plants, and 962nd nationally out of 1963 plants. Recent news coverage of the plant includes 6 articles related to industry, 2 related to regulatory matters, 2 related to the grid, and 1 related to deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
State
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.1K MWh
Latest Month
109.7K MWh
Annual Generation
13.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1278 lb/MWh
NOx
0.107 lb/MWh
SO₂
0.006 lb/MWh
CH₄
0.024 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
11.2%
Annual Net Gen
93 GWh
CO₂eq
1280 lb/MWh
Subregion
NPCC NYC/Westchester
2013
$965/kW
Est. Construction Cost
Total estimated cost: $90.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
HELLGT_W_13_KV_BRUCKNER_REV_LBMP_J
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
N.Y.C.
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Harlem River YardForward forecasts, scenario decomposition, and risk-decision tooling for this asset.