783.1 MW Natural Gas Fired Combined Cycle (598 MW) + Natural Gas Fired Combustion Turbine (185 MW) operating in Duval, FL
783.1 MW
Nameplate Capacity
4
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combined Cycle + Natural Gas Fired Combustion Turbine
2001
Operating Since
Coordinates
30.3206, -81.9472
County
Duval, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | JEA | JEA | — |
| Owner(s) | JEA | JEA | — |
| Status | Operating | — | — |
Brandy Branch is a 783.1 MW natural gas-fired power plant located in Duval County, Florida. The plant, which began operating in 2001, is owned and operated by JEA. It consists of four generators utilizing both natural gas-fired combined cycle and natural gas-fired combustion turbine technologies. Brandy Branch is considered a hybrid plant.
In the most recent year of data, Brandy Branch generated 4,985,794 MWh of electricity, achieving a capacity factor of 72.8%. The plant operates within the JEA balancing authority and the SERC NERC region. Brandy Branch is the 24th largest power plant in Florida out of 51, and ranks 261st nationally out of 945 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
JEA (JEA)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
444.6K MWh
Latest Month
5.0M MWh
Annual Generation
72.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
835 lb/MWh
NOx
0.088 lb/MWh
SO₂
0.004 lb/MWh
CH₄
0.016 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
67.5%
Annual Net Gen
4632 GWh
CO₂eq
836 lb/MWh
Subregion
FRCC All
2013
$965/kW
Est. Construction Cost
Total estimated cost: $755.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
LMP Node
FRCC
Pricing Hub
—
Last updated 2026-03-14