Search plants, projects, owners, and states
705.5 MW Natural Gas operating in Fauquier, VA
705.5 MW
Nameplate Capacity
4
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2000
Operating Since
Coordinates
38.5442, -77.7714
County
Fauquier, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Virginia Electric & Power Co | Virginia Electric and Power | — |
| Owner(s) | Virginia Electric & Power Co | Dominion Energy | — |
| Status | Operating | — | — |
The Remington power plant is a 705.5 MW natural gas-fired facility located in Fauquier County, Virginia. The plant began operating in 2000 and consists of four natural gas-fired combustion turbine generators. It is owned by Dominion Energy and operated by Virginia Electric & Power Co.
Remington operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. In the most recent year with available data, the plant generated 862,405 MWh, achieving a capacity factor of 13.9%. Remington is ranked as the 8th largest power plant out of 20 in Virginia, and 307th out of 945 nationally. Financial data indicates an installed cost of $272.87 per kW, according to FERC filings.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
42.4K MWh
Latest Month
862.4K MWh
Annual Generation
13.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1183 lb/MWh
NOx
0.318 lb/MWh
SO₂
0.011 lb/MWh
CH₄
0.025 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
5.0%
Annual Net Gen
308 GWh
CO₂eq
1185 lb/MWh
Subregion
SERC Virginia/Carolina
Internal combustion · VIRGINIA ELECTRIC AND POWER COMPANY · Data from 2015–2024
$333/kW
Installed Cost
$7/kW
Annual CapEx
$4.4/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Remington Combustion Turbine Substation · 230 kV
Substation Distance
0 km
Operator
Virginia Electric and Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
REMNTNCT18 KV GT1
Pricing Hub
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about RemingtonForward forecasts, scenario decomposition, and risk-decision tooling for this asset.