Search plants, projects, owners, and states
705.5 MW Natural Gas operating in Fauquier, VA
705.5 MW
Nameplate Capacity
4
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2000
Operating Since
Coordinates
38.5442, -77.7714
County
Fauquier, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Virginia Electric & Power Co | Virginia Electric and Power | — |
| Owner(s) | Virginia Electric & Power Co | Dominion Energy | — |
| Status | Operating | — | — |
The Remington power plant is a 705.5 MW natural gas-fired facility located in Fauquier County, Virginia. The plant began operating in 2000 and consists of four natural gas-fired combustion turbine generators. It is owned by Dominion Energy and operated by Virginia Electric & Power Co.
Remington operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. In the most recent year with available data, the plant generated 862,405 MWh, achieving a capacity factor of 13.9%. Remington is ranked as the 8th largest power plant out of 20 in Virginia, and 307th out of 945 nationally. Financial data indicates an installed cost of $272.87 per kW, according to FERC filings.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
42.4K MWh
Latest Month
862.4K MWh
Annual Generation
13.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
1183 lb/MWh
NOx
0.318 lb/MWh
SO₂
0.011 lb/MWh
CH₄
0.025 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
5.0%
Annual Net Gen
308 GWh
CO₂eq
1185 lb/MWh
Subregion
SERC Virginia/Carolina
Internal combustion · VIRGINIA ELECTRIC AND POWER COMPANY · Data from 2015–2024
$333/kW
Installed Cost
$7/kW
Annual CapEx
$4.4/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Remington Combustion Turbine Substation · 230 kV
Substation Distance
0 km
Operator
Virginia Electric and Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
REMNTNCT18 KV GT1
Pricing Hub
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
Last updated 2026-03-26
View all 6 articlesNo Ask reports yet for this entity.
Ask about RemingtonForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo