3.3 MW Distillate Oil standby in Charlevoix, MI
3.3 MW
Nameplate Capacity
3
Generators
units
Petroleum Liquids
Technology
2000
Operating Since
Coordinates
45.7291, -85.5244
County
Charlevoix, MI
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Great Lakes Energy Coop | — | — |
| Owner(s) | Great Lakes Energy Coop | — | — |
| Status | Standby | — | — |
The Beaver Island plant, located in Charlevoix County, Michigan, is a 3.3 MW diesel-fueled power plant. It began operating in 2000 and is owned and operated by Great Lakes Energy Coop. The plant consists of three generators utilizing petroleum liquids technology.
In the most recent year of data, the plant generated 71 MWh of electricity, resulting in a capacity factor of 0.2%. Beaver Island operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region. The plant's relatively small size results in a ranking of 26 out of 26 plants in Michigan, and 646 out of 886 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
25.0 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4 MWh
Latest Month
71 MWh
Annual Generation
0.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
4408 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
86 lb/MWh
SO₂
8 lb/MWh
CH₄
0.178 lb/MWh
N₂O
0.036 lb/MWh
Capacity Factor
0.2%
Annual Net Gen
0 GWh
CO₂eq
4422 lb/MWh
Subregion
RFC Michigan
2013
$765/kW
Est. Construction Cost
Total estimated cost: $2.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Beaver IslandForward forecasts, scenario decomposition, and risk-decision tooling for this asset.