3.6 MW Hydro operating in Defiance, OH
3.6 MW
Nameplate Capacity
6
Generators
units
Conventional Hydroelectric
Technology
1986
Operating Since
Coordinates
41.2371, -84.3997
County
Defiance, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Bryan - (OH) | — | — |
| Owner(s) | City of Bryan - (OH) | — | — |
| Status | Operating | — | — |
Auglaize Hydro is a 3.6 MW hydroelectric power plant located in Defiance County, Ohio. The plant began operating in 1986 and is owned and operated by the City of Bryan, Ohio. It utilizes six generators powered by conventional hydroelectric technology, with water (WAT) as its primary fuel source. Auglaize Hydro is connected to the PJM Interconnection, LLC balancing authority and resides within the RFC NERC region.
In the most recent year of reported data, Auglaize Hydro generated 6,516 MWh of electricity, achieving a capacity factor of 20.6%. The plant is ranked as the fourth largest of five hydroelectric facilities in the state of Ohio, and it holds a national ranking of 1005 out of 1464 hydroelectric plants in the United States.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
151 MWh
Latest Month
6.5K MWh
Annual Generation
20.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $8.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
PJM AEP Dayton
Pricing Hub
AEP-DAYTON HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Auglaize HydroForward forecasts, scenario decomposition, and risk-decision tooling for this asset.