Search plants, projects, owners, and states
20 MW Natural Gas operating in Sumner, KS
20 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
1989
Operating Since
Coordinates
37.2678, -97.3495
County
Sumner, KS
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Wellington - (KS) | — | — |
| Owner(s) | City of Wellington - (KS) | — | — |
| Status | Operating | — | — |
Wellington 2 is a natural gas-fired combustion turbine power plant located in Sumner County, Kansas. The plant has a total capacity of 20 MW and is operated by the City of Wellington. It began operating in 1989 and consists of a single generator. Wellington 2 is connected to the Southwest Power Pool (SPP) balancing authority and resides within the Midwest Reliability Organization (MRO) NERC region.
In the most recent year with available data, Wellington 2 generated 2,421 MWh of electricity, resulting in a capacity factor of 1.4%. The plant ranks 27th out of 53 power plants in Kansas and 1310th out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
154 MWh
Latest Month
2.4K MWh
Annual Generation
1.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1953 lb/MWh
NOx
5 lb/MWh
SO₂
0.053 lb/MWh
CH₄
0.037 lb/MWh
N₂O
0.004 lb/MWh
Capacity Factor
1.5%
Annual Net Gen
3 GWh
CO₂eq
1955 lb/MWh
Subregion
SPP North
2013
$965/kW
Est. Construction Cost
Total estimated cost: $19.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
WR_KP_WELLTNGT
Pricing Hub
SPPNORTH_HUB
Location Type
Settlement Location
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Wellington 2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.