Search plants, projects, owners, and states
8 MW Hydro out of service in Jasper, TX
8 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1989
Operating Since
Coordinates
30.7975, -94.1756
County
Jasper, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | USACE-Fort Worth District | — | — |
| Owner(s) | USACE-Fort Worth District | — | — |
| Status | Out of service | — | — |
The Robert D Willis plant, located in Jasper County, Texas, is a conventional hydroelectric facility with a total capacity of 8 MW. It began operating in 1989 and consists of two generators. The primary fuel source is water (WAT). The plant is owned and operated by the USACE-Fort Worth District.
The Robert D Willis plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the TRE NERC region. It is ranked as the 15th largest hydroelectric plant out of 24 in the state of Texas, and 731st out of 1464 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
25.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $18.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
TEXAS.HUB
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Robert D WillisForward forecasts, scenario decomposition, and risk-decision tooling for this asset.