Search plants, projects, owners, and states
5 MW Hydro operating in Glenn, CA
5 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1986
Operating Since
Coordinates
39.5868, -122.5332
County
Glenn, CA
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Santa Clara - (CA) | — | — |
| Owner(s) | City of Santa Clara - (CA) | — | — |
| Status | Operating | — | — |
Stony Gorge is a 5 MW hydroelectric power plant located in Glenn County, California. The plant began operating in 1986 and is owned and operated by the City of Santa Clara. It consists of two generators utilizing conventional hydroelectric technology and its primary fuel source is water (WAT).
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Stony Gorge is ranked 161 out of 247 power plants in California and 879 out of 1464 nationally. The latest annual generation data shows an output of 15,640 MWh, resulting in a capacity factor of 35.9%.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
60.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.0K MWh
Latest Month
15.6K MWh
Annual Generation
35.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $11.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
POD_ELKCRK_6_STONYG-APNDPOD_ELKCRK_6_STONYG-APND
Pricing Hub
TH_NP15_GEN-APND
Location Type
Aggregated Node
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Stony GorgeForward forecasts, scenario decomposition, and risk-decision tooling for this asset.