76.8 MW Natural Gas operating in Ocean, NJ
76.8 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
1989
Operating Since
Coordinates
39.8154, -74.2098
County
Ocean, NJ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Forked River Power, LLC | — | — |
| Owner(s) | Forked River Power, LLC | — | — |
| Status | Operating | — | — |
Forked River is a 76.8 MW natural gas-fired power plant located in Ocean County, New Jersey. The plant began operating in 1989 and consists of two natural gas-fired combustion turbine generators. It is owned and operated by Forked River Power, LLC. The plant is interconnected to the grid within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
In the most recent year of reported data, Forked River generated 3,832 MWh of electricity, resulting in a capacity factor of 0.6%. The plant ranks 20th out of 46 power plants in New Jersey by capacity, and 1010th out of 1963 plants nationally. Recent news coverage of the plant includes topics related to industry trends, hazards, and regulatory matters.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
336 MWh
Latest Month
3.8K MWh
Annual Generation
0.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
3219 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
7 lb/MWh
SO₂
0.065 lb/MWh
CH₄
0.057 lb/MWh
N₂O
0.006 lb/MWh
Capacity Factor
0.3%
Annual Net Gen
2 GWh
CO₂eq
3222 lb/MWh
Subregion
RFC East
2013
$965/kW
Est. Construction Cost
Total estimated cost: $74.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Oyster Creek Substation · 230 kV
Substation Distance
< 10 km
Operator
Jersey Central Power and Light
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
OYSTERCR14KV FR1
Pricing Hub
WESTERN HUB
Alt. Hub / Zone
DOMINION HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Forked RiverForward forecasts, scenario decomposition, and risk-decision tooling for this asset.