Search plants, projects, owners, and states
1680 MW Hydro operating in Oconee, SC
1,680 MW
Nameplate Capacity
4
Generators
units
Hydroelectric Pumped Storage
Technology
1991
Operating Since
Coordinates
35.0075, -82.9975
County
Oconee, SC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Duke Energy Carolinas, LLC | Duke Energy Carolinas | — |
| Owner(s) | Duke Energy Carolinas, LLC | Duke Energy | — |
| Status | Operating | operating | — |
The Bad Creek Hydroelectric Station is a pumped-storage hydroelectric power station located 8 miles (13 km) north of Salem in Oconee County, South Carolina. The 1,065-megawatt (1,428,000 hp) power plant is owned by Duke Energy, and its last generator was commissioned in 1991.
Read more on WikipediaThe Bad Creek Hydroelectric Station is a 1,680 MW pumped-storage hydroelectric plant located in Oconee County, South Carolina. It began operating in 1991 and is owned and operated by Duke Energy Carolinas, LLC, a subsidiary of Duke Energy. The plant consists of 4 generators using water as its primary fuel source. Bad Creek is the largest of 7 hydroelectric plants in South Carolina, and the 10th largest of 194 pumped storage plants nationally.
The plant's installed cost was $784.75 per kW, according to filings with FERC. Bad Creek operates within the Duke Energy Carolinas balancing authority, which is part of the SERC Reliability Corporation NERC region. The plant has a reported power purchase agreement (PPA) price of $25 per MWh. News coverage of the plant has focused on grid-related (7 articles) and regulatory (3 articles) topics.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Carolinas (DUK)
Grid Voltage
500.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−29.2K MWh
Net Charging
-550.1K MWh
Annual Net Energy
-3.7%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Duke Energy Carolinas, LLC · Data from 2015–2025
$25.0/MWh
PPA Price
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-19
View all 9 articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.