Search plants, projects, owners, and states
11679.3 MW Natural Gas Fired Combined Cycle (11427 MW) + Natural Gas Fired Combustion Turbine (252 MW) planned in Carson, TX
11,679.3 MW
Nameplate Capacity
157
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combined Cycle + Natural Gas Fired Combustion Turbine
Planned: —
Planned Operation
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
35.2838, -101.5690
County
Carson, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Fermi America | Fermi America | — |
| Owner(s) | Fermi America | Fermi America | — |
| Status | Planned | — | — |
No description available for this plant.
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
—
Balancing Authority
—
Grid Voltage
—
Regulatory Status
—
Entity Type
—
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09
View all articlesOTHERTexasA&M
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Project Matador Gas Plant (PMG)
Data-driven briefing on Project Matador Gas Plant (PMG) — fleet, generation, financial, and news signals.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Analyze Texas in detail
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.